Cleveland

*All renderings & pictures shown are for illustration purposes only. Some items shown may not be standard and/or represent the exact product or finish.

2 (3) BEDS

2 BATHS

1072 SQ. FT

16 W x 67 L

What We Love

  • L-shaped kitchen with 42” island
  • Bed 1 ensuite 
  • Cathedral ceiling through main living area
  • Flex room
  • 18” pantry cabinet
  • Open concept

A family gets a home of their own – with everything they need, without blowing their budget – it’s so reassuring.

CLEVELAND FLOOR PLAN

Steps to Move in Day

It takes only two weeks to build a home in our manufacturing facility, however the process from design to move in is dependent on a number of factors. Obtaining a building permit, site review, key product decisions and ensuring your design is complete & signed off are all important steps. For most of our clients the process from start to move in is between 16 to 24 weeks. Learn more about the steps that get you to move into day by clicking below.